Landlord electrical safety checks: EICR every 5 years explained
Landlords in England must have the electrics in rented homes inspected and tested regularly and share the results. Ask the assistant what the inspection covers, which deadlines apply and what happens when work is needed.
Posez votre question
Compte gratuit requisLes réponses sont rédigées par un modèle de langage à partir des seuls documents de cette base, avec leurs sources numérotées. Elles peuvent être inexactes et ne constituent pas un conseil juridique, médical ou financier : vérifiez les sources avant toute décision importante.
What the regulations require
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require landlords to have the electrical installations inspected and tested by a qualified person at least every 5 years. Since 2025 they also cover the social rented sector. The standard to meet is British Standard 7671, the 18th Edition of the Wiring Regulations.
The inspection covers the fixed electrical parts: wiring, sockets, light fittings, the consumer unit, permanently connected equipment such as showers and extractors, and circuits for solar PV and battery storage.
The landlord obtains a report, usually an Electrical Installation Condition Report (EICR), and must give it to existing tenants within 28 days, to new tenants before they move in, to prospective tenants within 28 days of a request, and to the council within 7 days of a request.
Reading the report codes
C1 means danger present and risk of injury. C2 means potentially dangerous. If C1 or C2 appears, the installation is unsatisfactory and remedial work is required. FI means further investigation is required without delay, and the landlord must have it carried out.
C3 means improvement recommended. It does not require remedial work for the report to be deemed satisfactory.
Required work must be completed within 28 days, or sooner if the report says so. The landlord then has 28 days to give the tenant and the council written confirmation that the work was done.
Keeping records and passing them on
The landlord must keep a copy of the report until the next inspection and test is required or carried out, unless a more recent report replaces it, and must give a copy to the person who will carry out the next inspection.
Acceptable written confirmation that remedial work was done includes a satisfactory EICR, an Electrical Installation Certificate (EIC), a Minor Electrical Installation Works Certificate (MEIWC) or other appropriate electrical certification.
The inspection itself checks whether any installations are overloaded, whether there are electric shock risks or fire hazards, whether there is defective electrical work, and whether earthing or bonding is lacking.
Questions fréquentes
Which homes are excluded from the electrical safety regulations?
Excluded tenancies include shared accommodation with the landlord or their family, long leases or tenancies of 7 years or more, student halls, hostels and refuges, care homes, hospitals and hospices, and mobile homes, caravans and boats.
What happens if a landlord does not carry out the remedial work?
The council must serve a remedial notice if it has reasonable grounds to believe the landlord is in breach. If the landlord does not comply, the council can arrange the work and recover the costs. For urgent work, it can act with the tenant's consent after giving at least 48 hours' notice.
What is the maximum fine for breaching the electrical safety rules?
Local councils may impose a financial penalty of up to £40,000 on landlords in breach of specified duties under the regulations. The landlord has a right of appeal against a demand for costs.
Do landlords have to test appliances such as cookers and fridges?
Social landlords must have electrical equipment they provide, such as cookers, fridges or microwaves, checked by a qualified person at least every 5 years, whatever its age. Tenants are responsible for making sure their own electrical equipment is safe.
Intégrer / API / MCP
Branchez cette base à Claude, Cursor, ChatGPT ou votre propre application. Chaque requête API ou MCP coûte 0,10 €, débitée de votre crédit Kopik (non facturée si rien n'est trouvé). Il vous faut une clé API : créez-la depuis votre tableau de bord.
MCP pour vos agents
Adresse du serveur MCP de cette base (outils ask_base et search_base) :
https://kopik.io/api/mcp?base=uk-renting-landlord-tenant-obligationsClaude Code, Cursor et autres clients
claude mcp add --transport http kopik-uk-renting-landlord-tenant-obligations "https://kopik.io/api/mcp?base=uk-renting-landlord-tenant-obligations" --header "Authorization: Bearer kpk_…"{
"mcpServers": {
"kopik-uk-renting-landlord-tenant-obligations": {
"url": "https://kopik.io/api/mcp?base=uk-renting-landlord-tenant-obligations",
"headers": {
"Authorization": "Bearer kpk_…"
}
}
}
}API REST pour vos applications
mode vaut "answer" (réponse rédigée + sources) ou "passages" (passages bruts seulement). Ajoutez un maxPriceCents facultatif pour plafonner le prix : si la base coûte plus cher, l'appel est refusé sans rien débiter.
curl -X POST https://kopik.io/api/v1/bases/uk-renting-landlord-tenant-obligations/query \
-H "Authorization: Bearer kpk_…" \
-H "Content-Type: application/json" \
-d '{"question": "Votre question ici", "mode": "answer"}'Pour commencer
- Créez une clé dans votre tableau de bord et rechargez votre crédit.
- Remplacez
kpk_…par votre clé. - Tout le détail (réponses, erreurs, exemples JS et Python) : documentation développeurs.